Moshe Dayan 36 in Ramat Gan
Reviews about Moshe Dayan 36
There are no reviews yet. You can be the first who rates it
Sign in to write a reviewProject info
Finished at | December 2019 |
Price, m2 | From 6500$ |
Buy online | Details |
Installment plan | — |
Bank mortgage | |
Property type | Aparment building |
Floors | 10 |
Apartments | 36 |
Condition | Turnkey |
Construction type | Monolyth |
Security | โ |
Conveniences |
Parking Near school Near kindergarten Near supermarket |
Personal discount certificate 300$ | |
Free consultation | Ask a question |
Promos and discounts for Moshe Dayan 36
About the project
Most of the 38 permits in the recreation neighborhood are part of a reinforcement and addition route, with the open requests anticipating the change in the trend towards demolition and construction.
At the same time, Plan C / 53, which deals with rights granted under the demolition and rebuilding alternative in TAMA 38, has not yet been approved.
According to city engineering recommendations, the maximum height of the new buildings to be built will be adjusted to the width of the streets according to the following key: For streets 7 meters and below or for a cul-de-sac up to 8 meters wide, a detailed plan for the entire street is required to obtain a permit for further construction. The streets with a maximum height of 7-12 meters will be 9 stories high, and the streets with a maximum width of 12 meters will have 10 stories.
In addition, the apartment multiplier for demolished buildings is in the entertainment neighborhood according to the recommendation of a top floor of 3.5, ie a maximum of 3.5 new apartments for each apartment destroyed. The multiplier is a numerical coefficient by which the number of final dwellings added to the building is calculated.
The municipality is currently in the process of formulating a new neighborhood blueprint, which is expected to deal with its planning future, and in deciding areas for renewal of areas - both through TAMA 38 and as part of evacuation-construction projects. The current location, location within the neighborhood and economic viability considerations. We recommend that you keep up to date with the progress of the plan.
Developer
ืืืืจื ืืงืืื ืืช ืืืงืื ืืฉื ืช 2002 ืืืืื ืืขืกืืง ืืชืโื 38 ืืงืืื ืืช ืืืืืืช ืืฉื ืช 2008. ืืชืื ืืชืืื ืืฆืจืื ืืฉืืง ืืืกืคืจ ืฉืื ืืืื ืืื ืืื ืืงืืืฆื, ืืืงืื ืืฉื ืช โฆDetails about Talbar
Contacts of Moshe Dayan 36 sales department
Hotline
Order a free transfer to Moshe Dayan 36
FAQ
Other objects nearby, Ramat Gan
Month | Total | Credit % | To debt | To percents | Balance |
---|
Add to list ยซยป?