Talbar

Moshe Dayan 36 in Ramat Gan

Reviews about Moshe Dayan 36

There are no reviews yet. You can be the first who rates it

Project info

Object ID: 7080
Finished at December 2019
Price, m2 From 6500$
Buy online Details
Installment plan
Bank mortgage
Property type Aparment building
Floors 10
Apartments 36
Condition Turnkey
Construction type Monolyth
Security โ€”
Conveniences Parking
Near school
Near kindergarten
Near supermarket
Personal discount certificate 300$
Free consultation Ask a question

Promos and discounts for Moshe Dayan 36

๐Ÿ“ฃ 300$ โ€” discount certificate
Personal discount certificate 300$
Contact us →

About the project

Most of the 38 permits in the recreation neighborhood are part of a reinforcement and addition route, with the open requests anticipating the change in the trend towards demolition and construction.

At the same time, Plan C / 53, which deals with rights granted under the demolition and rebuilding alternative in TAMA 38, has not yet been approved.

According to city engineering recommendations, the maximum height of the new buildings to be built will be adjusted to the width of the streets according to the following key: For streets 7 meters and below or for a cul-de-sac up to 8 meters wide, a detailed plan for the entire street is required to obtain a permit for further construction. The streets with a maximum height of 7-12 meters will be 9 stories high, and the streets with a maximum width of 12 meters will have 10 stories.

In addition, the apartment multiplier for demolished buildings is in the entertainment neighborhood according to the recommendation of a top floor of 3.5, ie a maximum of 3.5 new apartments for each apartment destroyed. The multiplier is a numerical coefficient by which the number of final dwellings added to the building is calculated.

The municipality is currently in the process of formulating a new neighborhood blueprint, which is expected to deal with its planning future, and in deciding areas for renewal of areas - both through TAMA 38 and as part of evacuation-construction projects. The current location, location within the neighborhood and economic viability considerations. We recommend that you keep up to date with the progress of the plan.

Developer

ื”ื—ื‘ืจื” ื”ืงื‘ืœื ื™ืช ื”ื•ืงืžื” ื‘ืฉื ืช 2002 ื•ื”ื—ืœื” ืœืขืกื•ืง ื‘ืชืžโ€ื 38 ื›ืงื‘ืœื ื™ืช ื•ื™ื–ืžื™ืช ื‘ืฉื ืช 2008. ืžืชื•ืš ื”ืชืืžื” ืœืฆืจื›ื™ ื”ืฉื•ืง ื•ืžืกืคืจ ืฉื™ื ื•ื™ื™ื ืžื‘ื ื™ื™ื ื‘ืงื‘ื•ืฆื”, ื”ื•ืงืžื” ื‘ืฉื ืช โ€ฆ
Details about Talbar

Contacts of Moshe Dayan 36 sales department

Order a free transfer to Moshe Dayan 36

Moshe Dayan 36 on the map of Ramat Gan

Moshe Dayan 36 Ramat Gan, Azor HaBiluim

FAQ

What payment options are available in Moshe Dayan 36?
Are there any discounts when purchasing an apartment in Moshe Dayan 36?
How many floors are there in Moshe Dayan 36?
What is the price per square meter in residential complex Moshe Dayan 36?
What is the type of the building construction in Moshe Dayan 36?
What kind of infrastructure is in Moshe Dayan 36?
What building is for renting out in Moshe Dayan 36?
When will the construction be completed?
How can I contact Moshe Dayan 36 sales department?