Гомельское областное УКС

microdistrict 21, railway number 1 in Gomel

Reviews about microdistrict 21, railway number 1

There are no reviews yet. You can be the first who rates it

Project info

Object ID: 13775
Finished at December 2020
Price, m2 From 550$
Housing class No
Buy online Details
Installment plan
Bank mortgage
Property type Aparment building
Square from 41.00 m2
Floors 18
Apartments 104
Building phase Completed
Condition Black walls
Construction type Monolyth
Security
Conveniences Parking
Kids playground
Near school
Near kindergarten
Near supermarket
Near hospital
Personal discount certificate 300$
Free consultation Ask a question

Promos and discounts for microdistrict 21, railway number 1

Sales in microdistrict 21, railway number 1 started!
Apartments in microdistrict 21, railway number 1 from …
Contact us →
📣 300$ — discount certificate
Personal discount certificate 300$
Contact us →

About the project

Residential building No. 1 in microdistrict 21 is a budget new building with spacious apartments with improved planning, located in an actively developing microdistrict just a few hundred meters from Lake Volotkovskoye.

Location

Railway number 1 in microdistrict 21 in Gomel is being built in the Central District, a hundred meters from the Eastern Bypass - a fairly busy highway. Near the railway there is both a plot with cottage buildings and new apartment buildings. There is a railway line a kilometer away.

Transport accessibility

There is a public transport stop 150 meters away - here with a minimum interval of nine minutes buses No. 20 and No. 34, as well as minibuses No. 23 and No. 27, run.

The nearest railway station “Volotova” is 2.5 km away, the central railway station “Gomel-Passenger” is located at a distance of 5.8 km. Gomel Airport can be reached in thirteen minutes by car.

What's around

Within a kilometer radius there are grocery stores, supermarkets, a pizzeria, a pharmacy, a bank branch, a dental clinic, a post office, a skating rink, a nursery-garden No. 11 "Kolosok" and a school No. 66. The beach "Cascade-1" can be reached in 11 minutes.

Main characteristics

The eighteen-storey one-section rectangular building is part of the development project for the southern part of the microdistrict.

The new building is being constructed using panel technology developed for the construction of houses of the 152M-3.14 series. The use of modern technologies and the best materials ensures high energy efficiency, which has a positive effect on the cost of housing maintenance. The facade is finished with fiber cement panels.

The building has a technical underground, where engineering equipment will be located. Two low-noise modern elevators are installed at the entrance. The entrance lobby is equipped with an insulated door equipped with a security and intercom system. A central heating system is provided.

The necessary conditions are created for people with limited mobility - unhindered access to the elevator from the entrance is provided, and ramps are arranged near the entrance.

Beautification

Pedestrian paths and asphalted driveways are being laid near the house, parking spaces for guest vehicles are being arranged. A children's playground with swings and recreation areas for residents are being equipped.

Landscaping is carried out on the territory, ornamental shrubs and trees are planted, lawns are broken. A site has been allocated for placing garbage containers.

Order a free transfer to microdistrict 21, railway number 1

microdistrict 21, railway number 1 on the map of Gomel

microdistrict 21, railway number 1

FAQ

What payment options are available in microdistrict 21, railway number 1?
Are there any discounts when purchasing an apartment in microdistrict 21, railway number 1?
How many floors are there in microdistrict 21, railway number 1?
What is the price per square meter in residential complex microdistrict 21, railway number 1?
What is the minimum price for an apartment in microdistrict 21, railway number 1?
What is the type of the building construction in microdistrict 21, railway number 1?
What kind of infrastructure is in microdistrict 21, railway number 1?
What building is for renting out in microdistrict 21, railway number 1?
When will the construction be completed?
What is the current stage of construction works?
How can I contact microdistrict 21, railway number 1 sales department?